§ Standards
Entries
2
Subject
Steel
traceability requirements
Traceability links every fabricated piece back to its cast or heat number and its inspection document. The level required rises with execution class, and hard stamping, transfer marking and part marking procedures all sit under this heading.
Index
Standards in Traceability
2 of 2 entries
- Part marking
Part marking and identification of fabricated steelwork
Erection marks, hard stamping and low stress marking methods keep pieces identifiable through blasting, coating and delivery without introducing notches in fatigue sensitive zones.
InternationalTraceabilityCURRENTFree
- Traceability practice
Cast number traceability through fabrication
Identification is transferred whenever material is cut so that each piece can be traced to its cast number and inspection document; full traceability is normally required from EXC3 upward.
InternationalTraceabilityCURRENTFree
Verification
StructuralSteel.ai provides technical reference information and links to authoritative sources. Project specifications, applicable legislation, current standards editions and requirements of the responsible engineer or authority should always be verified before fabrication or supply.